Washington Park 800 Dock Additions

This project involved the construction of a 450-foot long steel pile-supported, pre-cast concrete deck on steel beam luxury dock. It included cable TV, telephone, electrical and water hookups for each of the 54 slips, which are 35- and 40-feet long.