
Michigan City
Lake Shore Drive — Michigan City CCMG
Grant assistance and roadway design for Lake Shore Drive beside Washington Park, part of Michigan City’s 2023-2 Community Crossings paving program.
View projectMICHIGAN CITY, INDIANA
New sidewalk connections along Westwind Drive, U.S. 421, and Larkspur Lane, including a pedestrian crossing at the U.S. 421–Larkspur Lane intersection.

Close gaps in the sidewalk network and improve pedestrian connections between neighborhoods and commercial destinations in Michigan City’s South TIF area.
H&A provided civil engineering for Construction Contract No. 1 of the South TIF Connectivity Improvements program.
The design connected sidewalks along Westwind Drive, U.S. 421, and Larkspur Lane and added a pedestrian crossing at the signalized intersection.
H&A coordinated the crossing with traffic engineering subconsultant First Group Engineering and supported the project through bidding, construction administration, and inspection.
Design work took place in 2021–2022. Construction was underway in 2023, with substantial and final completion certified in October 2024.
PROJECT PHOTOGRAPHS
LET’S START A CONVERSATION
Tell us where your project is and what you want to accomplish. We’ll talk through how we can help.
Discuss your project526 Franklin Street
Michigan City, Indiana 46360