Michigan City Zoological Gardens - Watermain Extension

This project included the installation of 1,400 feet of water main in a very sensitive zoo area. Special project requirements required that the existing Works Project Administration (WPA) structures be left undisturbed, so most of the water main was installed by horizontal directional drilling rather than conventional open cut methods.

Project Images

Closer Look